Water Settlement Tank centre bearing refurb Vital maintenance to circular PST’s within several Wessex sites was overdue, it was essential that the disruption was kept to a minimum. Read more about Settlement Tank centre bearing refurb
Water Aeration Lane de-vegetation Vegetation clearance on wastewater aeration lanes. Read more about Aeration Lane de-vegetation
Water Aeration Lane general maintenance Aeration lane maintenance in a Thames Water STW including pipe and valve replacement whilst maintaining continuous operation of the plant. Read more about Aeration Lane general maintenance
Water Filter Tank capping stone replacement The narrow lane through the tank was due routine maintenance, capping stone replacement and repairs, but access was proving difficult due to anchoring issues Read more about Filter Tank capping stone replacement
Access, Water Reservoir intake tower repairs The contractor needed access to refurbish the intake tower, but there was no access for plant and the on-site crane had a short reach. Read more about Reservoir intake tower repairs
Water Clarifier Tank inlet valve replacement Routine maintenance indoor clean water tanks across 6 sites. Read more about Clarifier Tank inlet valve replacement