The construction of two 16m x 8m drilling pontoon platforms at Blackwall Basin in Canary Wharf has enabled our client to access the watercourse for core sampling works as part of this on-going residential and commercial development in London’s Isle of Dogs.  

The pontoons are completed with Combisafe edge protection, load spreading deck mats and a 500mm drilling aperture, they will be moved within the basin by work boats manned for the duration the works.  Our in-house stability calculation software is vital to guaranteeing the safety of all our pontoons particularly on the scale of such a development.  All of our installations are backed up full RAMS and are installed by the only team carrying Skilled Worker Pontoon Installer CSCS cards.  

Wood Wharf  is a development of 22 acres on the Thames in London when complete, it will house some 3,200 new homes, nearly 2 million square feet of office space and 340,000 square feet of shops and restaurants.