Our client needed a working platform and access to piles for the construction of a new bridge. The solution is a 250m sq single layered pontoon encapsulating the piles within 1.5m x 1.5m moonpools. Combisafe edge protection is erected to all outside edges.

When complete the £12m pedestrian bridge in Hull will link the marina to the southern end of Princes Dock.