Our client required access to the timbers and gangway of a quayside to undertake maintenance and repair works to various components of the structure.

We installed a pontoon working platform, 82m x 2.5m   with a 25m sq platform encapsulating the pile supporting the gangway.  Combisafe edge protection was installed on all outside edges 0.5m inboard to complete the safe installation.