A new client required access to re-point and repair a bridge on the Monmouthshire and Brecon Canal recently.  Our 100m x 2.5m pontoon installation provided easy and safe access and egress to the worksite.  Moored to the bank, the access pontoon and working platform spanned the 80m length of the bridge and beyond.  Moveable edge protection allowed the workforce to undertake the work easily and quickly with minimum risk.