01935 814 950

NEWS ARCHIVE

Bristol Landmark

We’ve embarked on a local project recently as work started on the 23 week construction of a new pedestrian bridge spanning Bristol Floating Harbour. The much anticipated S shaped bridge will form a shared pedestrian and cycle way connecting one of Bristol’s leading regeneration schemes, Finzels Reach with Castle Park. We currently have 4 different […]

Mobile Tower Scaffold

This manoeuvrable mobile tower scaffold platform for engineers to undertake bridge inspection works enabled our client to service 4 bridges in 3 days. We provided a 20m² modular pontoon with Combisafe edge protection and mobile tower scaffold, secured to the deck with bespoke internal fixing pins. Our manned workboat safely transported the installation and 2 […]

Latitude Festival

One of our teams had the chance to spend a few days in Suffolk last week at Latitude Festival. Our client enthralled festival goers with an impressive theatrical production on the Lake in Henham Park with the aid of our pontoon. The modular platforms fitted with outboard motors were used as stages to […]

Pedestrian Bridge Repairs Using A Modular Working Platform

A new client needed access to this pedestrian bridge in Sussex and our modular working platform provided the solution. The 58m² platform encapsulated the bridge piles with a 2m x 5m walkway from the shore, Combisafe edge protection completed the safe working area for personnel to undertake repair works efficiently and on time.

Plant Access Pontoon

This 10x5m plant access pontoon on the River Avon in Wiltshire gives our client a safe solution for reaching a small island owned by The Community of St Nicholas Hospital in Salisbury. The 15 year old wooden piling is rotten and needs to be replaced to shore the banks. Replacement oak panels will […]