We’ve started the new year with a new modular working platform installation in Devonport Dockyard.  Our 20m x 3m modular installation is providing a personnel walkway and materials laydown area for engineers to repair an existing permanent pontoon at the historic dockyard.   

The walkway is fenced to both sides with Combisafe edge protection and the area adjacent to the dockside will give valuable space to extend the working area.  This pontoon will be manoeuvred around the site to facilitate the works to the entire pontoon.  

Bespoke platforms are delivered with full RAMS and method statements are signed off on each job before mobilisation.     We will continue to provide our professional service throughout lockdown.