Our client needed a pump platform for lake dredging works at a Thames Water site in North London.  We supplied a 4m x 8m single layered pontoon incorporating a 1m x 4m moon pool.  The platform was loaded with a steel ‘A’ frame with a 500kg SWL and load spreading mats to accommodate a 1 tonne generator.  Combisafe edge protection completed the installation for this job.  All equipment was delivered and constructed at a launch point on an accessible stretch of river and when completed was deployed to the work site on a nearby lake.